Application for a licence to abstract and use water or construct or alter or cause to be constructed or alter any works for the abstraction and use of water |
JMD $15,000.00 |
Licence to abstract and use water or construct or alter or cause to be constructed or altered any works for the abstraction and use of water (Renewable every 5 years) |
JMD $30,000.00 |
Application for the consent of the Authority to sink, enlarge or otherwise alter a well |
JMD $15,000.00 |
Consent (permit) to sink, enlarge or otherwise alter a well (Valid for 1 year) |
JMD $30,000.00 |
Well-driller’s licence (Renewable every 2 years) |
JMD $40,000.00 |
Volume Based Fees (VBF) -
These are due on April 1 annually.
They are calculated based on the specified use for which a licence was granted. |
Fees JMD$4.545m3/ annum |
Domestic/ Public Supply |
JMD $0.1150 |
Industrial |
JMD $0.1725 |
Non-Consumptive (Including but not limited to, hydropower and aquaculture).
|
JMD $0.0920 |
Agriculture |
JMD $0.1725 |